Adlink HPERC-IBR-MC Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Matériel Adlink HPERC-IBR-MC. ADLINK HPERC-IBR-MC User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - HPERC-IBR-MC/MH

Advance Technologies. Automate the World.HPERC-IBR-MC/MHHigh Performance Extreme Rugged™ Computer SystemUser’s ManualManual Rev.: 0.20 PreliminaryRev

Page 2 - Revision History

x List of TablesThis page intentionally left blank.

Page 3 - Preface iii

1HPERC-IBR-M1 HPERC-IBR-M Setup1.1 About the HPERC-IBR-MThe HPERC products are intended for users of embedded systems requiring long life-cycles,conf

Page 4

21.5 Power SpecificationsTable 1-1 defines the current draw values of the HPERC-IBR-M, featuring either the 3517UE,3555LE, or 3612QE i7 CPUs. The tabl

Page 5 - Table of Contents

3HPERC-IBR-M1.6 Environmental SpecificationsTable 1-2 provides the most efficient operating and storage condition ranges required for thissystem.

Page 6

41.7 What’s in the Box The Contents List identifies the items in the shipping box for the HPERC-IBR-M Unit andHPERC-IBR-M Accessories (sold separately

Page 7 - List of Figures

5HPERC-IBR-M1.8 Setup StepsFollow the setup steps in this section in the order listed. Skip any steps that do not apply to yourapplication. 1.9 Setti

Page 8

61.10 Installing Mounting ScrewsFigure 1-3: Top and Front Views of “MH” Enclosure with Mounting Dimensions5) Install mounting screws.• Install mountin

Page 9 - List of Tables

7HPERC-IBR-MFigure 1-4: Top and Front Views of “MC” Enclosure with Mounting DimensionsMounting Screws = 1/4" - 20 (M6x1)

Page 10

81.11 Connecting PeripheralsFigure 1-5: Front View of HPERC-IBR-M I/O Panel6) Connect the appropriate military breakout cable to the corresponding HPE

Page 11 - 1 HPERC-IBR-M Setup

9HPERC-IBR-M Table 1-3: I/O Panel Connectors (Refer to Figure 1-5 for connector locations.) Control/Connector DescriptionP1 DC Power In This Milit

Page 12 - 1.5 Power Specifications

ii Revision HistoryRevision HistoryRevision Reason for Change Date0.10 Preliminary draft 13-01-20150.20 Minor corrections 05-05-2015

Page 13 - Temperature Humidity

101.12 P2 and P3 Military ConnectorThe following two tables define the signals and signal maps of the two military I/O connectors(P2 and P3) on the HP

Page 14 - 1.7 What’s in the Box

11HPERC-IBR-M1.12.1 P2 Pin DefinitionsTable 1-4 Provides the pin definitions and signal maps for the P3 Military Connector.P2 PinInterface Signal Sig

Page 15 - 1.8 Setup Steps

1244 Ground GND Ground 6 NA36 Control/Indicator HPOUT_R Audio Right NA NA37 Control/Indicator HPOUT_L Audio Left NA NA38 Ground GND Ground 335 NA39 Po

Page 16 - 5) Install mounting

13HPERC-IBR-M89 User Defined IO UDNIO2 User Input/Output Port 2 NA CN4-690 Ground GND Ground 376 NA91 User Defined IO UDNIO3 User Input/Output Port 3

Page 17

141.12.2 P3 Pin Definitions Table 1-5 Provides the pin definitions and signal maps for the P3 Military Connector.P3 PinInterface Signal Signal Descrip

Page 18 - 1.11 Connecting Peripherals

15HPERC-IBR-M100 Gigabit Ethernet 4 GbE5_MDI3_N Ethernet4 MDI3 Negative155 CN2-47101 Gigabit Ethernet 4 GbE5_MDI3_P Ethernet4 MDI3 Positive 165 CN2-4

Page 19 - Control/Connector Description

1657 DVI 1 DDIB_P3 Digital Display Interface Port B, TMDS Clock Positive121 CN3-7358 DVI 1 DDIB_N3 Digital Display Interface Port B, TMDS Clock Negati

Page 20 - HPERC_J2J3_connPins_b

17HPERC-IBR-M80 DVI 2 DDIC_P3 Digital Display Interface Port C, TMDS Clock Positive7 CN3-7281 DVI 2 DDIC_N3 Digital Display Interface Port C, TMDS Cl

Page 21 - 1.12.1 P2 Pin Definitions

18107 Gigabit Ethernet 3 GbE4_MDI1_P Ethernet1 Positive 146 CN2-19109 Gigabit Ethernet 3 GbE4_MDI0_N Ethernet0 Negative 176 CN2-14110 Gigabit Ethernet

Page 22

19HPERC-IBR-M1.13 Applying Power to the HPERC-IBR-M7) Follow these steps to apply power to the HPERC-IBR-M.• Connect the AC Mating Cable to the AC Ad

Page 23

Preface iiiHPERC-IBR-MPreface© Copyright 2015 ADLINK Technology, Inc.www.adlinktech.comDisclaimerInformation in this document is provided in connecti

Page 24 - 1.12.2 P3 Pin Definitions

20This page intentionally left blank.

Page 25

21HPERC-IBR-M2 Internal ComponentsThis chapter discusses the optional components inside the HPERC-IBR-M enclosure. Thesecomponents include the SSDs (

Page 26

222.1.3 Replacing the SSDs (Solid State Drives)The SSD slots are two of three externally accessible component slots on the enclosure. Theother externa

Page 27

23HPERC-IBR-M2.1.4 Replacing the SD (Secure Digital) Memory CardThe SD memory card slot is one of three externally accessible component slots on the

Page 28

242.1.5 Removing and installing the system cover plate on the HPERC-IBR-M enclosureThe system cover plate allows you access to the internal components

Page 29

25HPERC-IBR-M2.1.6 Replacing the PCI/104-Express expansion moduleThe HPERC-IBR-M allows for expandable IO with a slot for a stackable PCI/104-Express

Page 30

264) Remove the PCI/104-Express module mounting screws and module as shown in Figure 2-11.Figure 2-11: Exploded View of HPERC-IBR-M with PCI/104-Expr

Page 31 - 2 Internal Components

27HPERC-IBR-M2.1.7 Replacing the SODIMM memoryThe HPERC-IBR-M features one SODIMM socket for up to 8GB of DDR3 memory, providing a64-bit wide channel

Page 32

284) Disconnect the FPC connector from its mating connector on the system as shown in Figure 2-13.Figure 2-13: Exploded View of HPERC-IBR-M with Flex

Page 33

29HPERC-IBR-M6) Remove the SODIMM cover plate and SODIMM as shown in Figure 2-15. Make sure to use ESD precautions when handling the SODIMM.Figure 2

Page 34 - Cover Plate Screws

iv PrefaceThis page intentionally left blank.

Page 35 - SSD Bracket

302.1.8 Replacing the Mini PCIe CardThe HPERC-IBR-M features one Mini PCIe Card slot for high-speed serial I/O capability.To remove the Mini PCIe Card

Page 36 - PCI/104-Express Module

Getting Service 33HPERC-IBR-MGetting ServiceADLINK “Ask an Expert” is a comprehensive support center designed to meet all your technicalneeds. This s

Page 37 - FFC Connectors

34 Getting ServiceADLINK Technology, Inc. (French Liaison Office) Address: 6 allée de Londres, Immeuble Ceylan 91940 Les Ulis, France Tel: +33

Page 38 - Figure 2-13

vHPERC-IBR-MTable of ContentsRevision History...

Page 39 - To install the SODIMM

viThis page intentionally left blank.

Page 40 - Mini PCIe Card

List of Figures viiHPERC-IBR-MList of FiguresFigure 1-1: i7-3517UE Peak In-Rush Current and Duration...

Page 41 - Getting Service

viii List of FiguresThis page intentionally left blank.

Page 42 - 34 Getting Service

List of Tables ixHPERC-IBR-MList of TablesTable 1-1: System Power Requirements ..................

Commentaires sur ces manuels

Pas de commentaire